Four panel composite door is now in the raised position ready for the main arch to be rolled back on the rail system.
 
 

 

Overhead view show rails in the background and three conduits coming up from the isolated concrete pier that the telescope attaches to.

Red conduit is power and the two green conduits are for data lines.